26th November 2024
One of the things we did all the time at early GitHub was a two-step ship: basically, ship a big launch, but days or weeks afterwards, ship a smaller, add-on feature. In the second launch post, you can refer back to the initial bigger post and you get twice the bang for the buck.
This is even more valuable than on the surface, too: you get to split your product launch up into a few different pieces, which lets you slowly ease into the full usage — and server load — of new code.
— Zach Holman, in 2018
Recent articles
- Publishing WASM wheels to PyPI for use with Pyodide - 13th June 2026
- Claude Fable is relentlessly proactive - 11th June 2026
- Initial impressions of Claude Fable 5 - 9th June 2026